PROCESS

Considering installing an energy storage system? Octave’s battery system can be deployed at your site, in just a few months! We support you throughout the entire process.

1. PERSONALIZED ASSESSMENT

  • Define optimal battery dimensions.
  • Business case is analyzed.

2. BINDING OFFER

  • Quote is approved and signed.

3. PERMITTING AND GRID STUDY

  • Grid study is requested.
  • Permit is requested, if applicable.

4. ELECTRICAL CONNECTION

  • Contract with installer.
  • Electrical connection plans are drawn.

5. INSTALLATION

  • Battery system is delivered on site.
  • Octave provides the installation guide.
  • The installer completes the installation.

6. COMMISSIONING

  • Inspection of the electrical connection, if applicable.

Frequently Asked Questions

Do Octave batteries meet the strictest standards?

Can I expand later?

What does the Octave EMS do with my battery?

Can I start with local control and move to an imbalance model later?

What if the forecast is wrong?

What is the difference between peak shaving and grid congestion management?

Why Battery Care?

Do I get both a product and a performance warranty?

Does Octave.energy keep spare parts in stock?

Can I switch energy supplier later?

Is the Local Optimizer right for me?

Do I need to configure anything myself?

My grid operator requires remote control. What does that mean for the EMS?

How does the grid services fee work?