Octave installed a 2nd-life battery system prototype🔋

Octave has installed a second-life battery prototype of 6 kWh. The battery modules were sourced from an electric car built in 2013.

MEER LEZEN
Second Life Battery

Octave's first battery is live! 🔋

D-Day for Octave! We are installing our first battery pack at Ipalle's waste incinerator site in Thumaide. The storage system has a capacity of 67 kWh and 60 kW. It will optimize Ipalle's imbalance position and hence contribute to the stability of the Belgian high voltage power grid. The performance of the battery can be followed directly on our Energy Management Page

MEER LEZEN
Ipalle PoC